Notes
Draft memorandum AR024622 dated February 14, 2000, from Doug Henderson and Linda Logan to Keith Smith (project number 556-2912-01), summarizing efforts to develop a site-specific water quality criterion (WQC) for copper in Miller Creek, Walker Creek, and Des Moines Creek in connection with Port Of Seattle third runway stormwater discharges (SDS-3). Document covers the Water-Effect Ratio (WER) and site-specific metals translator approaches, initial toxicity screening using Ceriodaphnia dubia (January 14, 1999), range-finding studies (February 23, 1999), and WER Workplan development (July 23, 1999). Discusses negotiations with Washington Department of Ecology (Gary Bailey), WAC 173-201A-100(2) AKART requirements, point of compliance for mixing zones, critical conditions per WAC 173-201A-020, Northwest Ponds, Lake Reba, and a parallel Parametrix project for City of Chehalis on copper, silver, and zinc in the Chehalis River. Filed in PCHB Third Runway EIS administrative record.