EXH 294: Third Runway Off-Site Borrow Source Baseline Chemical Characterization, Black River Quarry, Renton WA

This December 2001 report, prepared by Hart Crowser, Inc. for the Port of Seattle, presents baseline chemical characterization results for the Black River Quarry in Renton, Washington, which was evaluated as an off-site borrow source of fill material for the Sea-Tac Third Runway Project. The study involved soil sampling, metals analysis, and data quality review to assess the suitability of quarry material for use in runway construction. Tables and figures detail sample locations, soil descriptions, and total metals analytical results from laboratory testing by North Creek Analytical, Inc.

Notes

Exhibit 294 (AR 019785–019787), prepared by Hart Crowser, Inc. (Neil F. Morton, Project Toxicologist; Richard F. Moore, Senior Associate Environmental Specialist) for Port Of Seattle, December 12, 2001, project number 4978-06. Baseline chemical characterization report for the Black River Quarry in Renton, Washington, evaluated as an off-site borrow source for the Third Runway Project at Sea-Tac Airport. Contains total metals analytical results, soil sample descriptions, sampling methodology, chemical data quality review, and laboratory analytical documentation from North Creek Analytical, Inc. Filed in PCHB (Pollution Control Hearings Board) proceedings related to the third-runway EIS.

V V