
Aerial photograph showing large-scale earthwork and grading operations during construction of Seattle-Tacoma International Airport's third runway (Runway 16C/34C). The image shows the runway surface and surrounding excavated terrain, with the existing airport facilities and control tower visible in the background.Open full document
Notes
Aerial photograph showing large-scale earthwork and grading operations during construction of Seattle-Tacoma International Airport’s third runway (Runway 16C/34C). The image shows the runway surface and surrounding excavated terrain, with the existing airport facilities and control tower visible in the background.