Notes
Chapter 7 of a draft study evaluating alternative measures to reduce aircraft delays resulting from airspace interactions between Sea-Tac Airport and Boeing Field. Topics include improved ATC technology, reduced aircraft separations, Microwave Landing System (MLS) instrument approaches, new Runway 13-31 at Sea-Tac, reliever airports, IFR quotas, IFR peak period surcharges, and cooperative rescheduling of flights. Analysis covers effect on airfield and airspace capacity, aircraft delay, cost of implementation, and feasibility. Document is labeled ‘Working Draft for Discussion Purposes Only’ and references the 1982 National Airspace System Plan.
