StART SIRRPP Update — Pilot Program Schedule Timeline (February 2024–2025) — Slide 3

A timeline slide detailing the Pilot Program Schedule spanning February 2024 through early 2025, including key milestones such as a Commission Order (Feb 27), survey mailings (Jun–Aug 2024), Part 150 Meetings (Jun 5, 6, and 8), acoustic testing (Aug 19/30), a Draft Technical Report (Nov 22), a Final Report Approval (Dec 23), a Commission Report (January 2025), and a Design/Construction Kickoff in 2025. The slide appears to be page 3 of a presentation related to Sea-Tac Airport noise policy under FAA Part 150 procedures.

Notes

A timeline slide detailing the Pilot Program Schedule spanning February 2024 through early 2025, including key milestones such as a Commission Order (Feb 27), survey mailings (Jun–Aug 2024), Part 150 Meetings (Jun 5, 6, and 8), acoustic testing (Aug 19/30), a Draft Technical Report (Nov 22), a Final Report Approval (Dec 23), a Commission Report (January 2025), and a Design/Construction Kickoff in 2025. The slide appears to be page 3 of a presentation related to Sea-Tac Airport noise policy under FAA Part 150 procedures.

V V