Memorandum dated October 30, 2001 from Michael Kenrick of Hart Crowser, Inc. to Jim Thomson of HNTB, CC Elizabeth Leavitt of Port Of Seattle, project number 4978-06. Addresses wetland hydrology impacts of Third Runway Embankment Fill construction at Sea-Tac Airport, covering depression wetlands, slope wetlands, and riparian wetlands. References Miller Creek and Walker Creek baseflow, hydrogeologic conditions, Final Environmental Impact Statement (FEIS) Master Plan Update (FAA/Port of Seattle 1996), Geotechnical Engineering Report 404 Permit Support (Hart Crowser 1999a), Sea-Tac Runway Fill Hydrologic Studies Report (Pacific Groundwater Group PGG 2000), Baseline Groundwater Study (AGI 1996), Hydrologic Modeling Study (Montgomery Water Group 1995), and Washington State Department of Ecology review. Discusses infiltration, runoff, evapotranspiration, perched water-bearing zones, shallow regional aquifer, and US Army Corps of Engineers permit context.