EXH AR051053: Final Draft Conceptual Borrow Material Development and Reclamation Plan, Borrow Areas 3 and 4, Sea-Tac Airport

Notes

Hart Crowser prepared this Final Draft Conceptual Borrow Material Development and Reclamation Plan for Borrow Areas 3 and 4 at Sea-Tac International Airport, City of SeaTac, Washington, for the Port Of Seattle, dated August 15, 2001 (project number 4978-65). The plan covers site preparation, excavation practices, reclamation, revegetation, weed control, stormwater management, and wetland protection including Des Moines Creek haul route crossing. Topics include site soils and geology, hydrology, perched water-bearing zones, shallow regional aquifer, wetlands mapping, NPDES stormwater discharge monitoring, and concurrent and final reclamation plans over a two-year operation period in connection with the Sea-Tac Master Plan Update EIS process.