Notes
Hart Crowser, Inc. report prepared for HNTB and the Port of Seattle, project number 4978-06, dated June 18, 2001, addressing avoidance of wetland impacts associated with Temporary Stormwater Pond A for the Sea-Tac Third Runway project. Includes summary of subsurface conditions, protection of wetlands analysis, groundwater seepage analysis, observed groundwater levels in monitoring wells near Pond A (borings HC99-B38, HC99-B39, HC00-A300, HC00-A301), cross sections A-A’ and B-B’, and site/exploration plan figures.
