EXH AR034813: Email and Meeting Notes — Jim Kelley and Katie Walter, STIA Clarifications, April 12, 2001

Notes

Email from Jim Kelley (Parametrix, Inc.) to Katie Walter (klw@shanwil.com) dated April 26, 2001, transmitting preliminary draft meeting notes from an April 12, 2001 meeting regarding STIA mitigation site clarifications. The 20-item meeting notes cover Auburn mitigation site hydroseeding, water levels, radius of influence on adjacent wetlands, biofiltration on NRMP Sheet 3.3, dispersal trench elevation relative to sewer lines, Vacca Farm manhole abandonment, log weir anchoring with hemp rope and steel cable in peat soils, TESC erosion control measures, geotextile liner for stream channel in peat, straw bale filters, 100 gpm pump adequacy, tree staking, willow density in coir lifts, and flow dispersal structures. AR 034813, ECY00021953, Exhibit-2210.

V V