EXH AR029093: Sea-Tac Airport Third Runway 401 Permit Negotiations Meeting Notes Summary, October–December 2000

Notes

Floyd & Snider Inc. meeting notes summary covering Sea-Tac Airport Third Runway 401 Permit negotiations between Port Of Seattle and Washington State Department of Ecology (Ecology), October 2 through December 8, 2000. Documents master list of 401 Permit technical issues including Stormwater Master Plan detention sizing, basin acreage discrepancies, HSPF and KCRTS hydrological models, IWS pump station modeling, Walker Creek calibration, Des Moines Creek Basin Plan consistency, flow augmentation for Des Moines Creek, Natural Resources Mitigation Plan (NRMP), wetlands 18/37/39B hydrology, SASA facility volumes, King County off-site flow criteria, Borrow Site #3 hydrology, runway de-icing/dissolved oxygen study, SR 509 interchange impacts, aquitard breaches, contaminated soil stockpile facility, NEPA/SEPA revision timing, and Kludt settlement compliance. AR 029093, ECY00019049.