EXH AR029002: Sea-Tac Airport Third Runway 401 Permit Negotiations — Final Draft Meeting Notes, October 10, 2000

Notes

Final draft meeting notes prepared by Kate Snider of Floyd & Snider Inc. for the Sea-Tac Airport Third Runway Section 401 Permit Negotiations meeting held October 10, 2000, 9:00–4:00. Attendees included representatives from Washington State Department of Ecology (Ray Hellwig, Kevin Fitzpatrick, Tom Luster, Chung Ki Yee), Port Of Seattle (Michael Cheyne, Elizabeth Leavitt, Keith Smith), King County (David Masters, Kelly Whiting), Parametrix (Paul Fendt, Jim Kelley), Earth Tech (Rick Schaefer), Hart Crowser (Michael Bailey, Michael Kenrick), and Floyd & Snider (Kate Snider, Rachel McCrea). Document AR029002 / ECY00000853. Topics include master list of 401 technical issues, Stormwater Master Plan (SMP) detention sizing, HSPF and KCRTS models, IWS pump station, Des Moines Creek flow augmentation, South Access Road/Tyee Pond impacts, Borrow Site #3 hydrology, HPA/401 issuance relationship, SASA facility volumes, Walker Creek calibration, Miller Creek aquitard breaches, de-icing/first flush study, Kludt settlement compliance, NEPA/SEPA revision timing, and Natural Resources Mitigation Plan (NRMP).

V V