Notes
Sheldon & Associates letter dated February 15, 2001, responding to public notice comments regarding the Seattle-Tacoma International Airport Masterplan Update Projects Section 404/401 Permits. Addresses movement of water through embankment fill and Mechanically Stabilized Earth (MSE) wall, drainage layer design to prevent excess pore pressures, rock underdrain clogging prevention using Group 1A filter material, shallow groundwater flow maintenance to downslope wetlands (Wetlands 18, 37, 44), Miller Creek hydrology, aquifer compaction under fill, interflow replacement via underdrain collection, and replacement drainage swales. References Pacific Groundwater Group 2000 Sea-Tac Runway Fill Hydrologic Studies Report, Hart Crowser 1999 Geotechnical Report, Parametrix 2000 Wetland Functional Assessment, and Hart Crowser December 9 1998 Sea-Tac Third Runway-Aquifer Compaction letter. AR018360–AR018362.
