EXH AR018326: Memorandum on Wetland Hydrology and the Third Runway Embankment Fill

Notes

Memorandum dated October 30, 2001 from Michael Kenrick of Hart Crowser, Inc. to Jim Thomson of HNTB (project number 4978-06), CC Elizabeth Leavitt of Port Of Seattle, regarding wetland hydrology impacts of the Third Runway Embankment Fill at Sea-Tac Airport. Covers depression wetlands, slope wetlands, and riparian wetlands; references FEIS for the Master Plan Update (FAA/Port of Seattle 1996), Hydrologic Modeling Study (Montgomery Water Group 1995), Baseline Groundwater Study (AGI 1996), Geotechnical Engineering Report – 404 Permit Support (Hart Crowser 1999a), and Sea-Tac Runway Fill Hydrologic Studies Report (PGG 2000). Discusses groundwater, subsurface soils, Miller Creek, Walker Creek, US Army Corps of Engineers 404 permit, Washington State Department of Ecology, and hydrologic modeling of embankment construction impacts. AR018326.