StART SIRRPP Update — Next Steps (Implementation Workshops, Design/Construction Phase) — Slide 17 — February 26, 2025

A presentation slide titled 'Next Steps' listing two bullet points: 'Implementation Workshops' and 'Design/Construction Phase.' The slide is numbered 17 and uses a teal/blue color scheme with a green and blue wave graphic at the bottom, consistent with a planning or project-status presentation.

Notes

A presentation slide titled ‘Next Steps’ listing two bullet points: ‘Implementation Workshops’ and ‘Design/Construction Phase.’ The slide is numbered 17 and uses a teal/blue color scheme with a green and blue wave graphic at the bottom, consistent with a planning or project-status presentation.

V V