
A presentation slide showing the Airport Capital Funding breakdown of $4,918.9 million for 2025–2029, with the largest source being Future Revenue Bond Proceeds at $3,395.9 million. The slide notes that 92% is funded from operating cash flow and revenue bonds, with $364M in capital grants (AIP) allocated to projects including S Concourse Evolution, Noise Insulation projects, and Checkpoint 1 Relocation.Open full document
Notes
A presentation slide showing the Airport Capital Funding breakdown of $4,918.9 million for 2025–2029, with the largest source being Future Revenue Bond Proceeds at $3,395.9 million. The slide notes that 92% is funded from operating cash flow and revenue bonds, with $364M in capital grants (AIP) allocated to projects including S Concourse Evolution, Noise Insulation projects, and Checkpoint 1 Relocation.