EXH AR052350: Geotechnical Summary Report — Third Runway Embankment and MSE Retaining Walls, STIA

Notes

Hart Crowser, Inc. geotechnical summary report prepared for the Port of Seattle for presentation to the U.S. Army Corps of Engineers (Seattle District), dated November 2, 2001, project number 4978-06. Covers design of the Third Runway embankment and three mechanically stabilized earth (MSE) retaining walls (50–135 feet height) at Seattle-Tacoma International Airport (STIA). Addresses 17,000,000 cubic yards of compacted fill, 3,000,000 cubic yards of excavation, soil conditions, groundwater, seismic hazards, earthquake risk, slope stability, and construction mitigation measures. Signed by Project Manager Michael Bailey, P.E. (Washington State license 22484). Includes independent technical review board involvement.