Conditions accepted and appealed summary table

This document lists 16 permit conditions related to environmental protections at what appears to be a Port development project, showing which conditions were accepted and which were appealed. Conditions covering stormwater management, wetland mitigation, fill criteria, and water quality monitoring were contested, with 8 of the 16 conditions formally appealed. Accepted conditions include stormwater sampling, wetland hydroperiod matching, and long-term contamination monitoring requirements.

Notes

This document is a table listing 16 permit or regulatory conditions related to stormwater management, fill criteria, wetland mitigation, and water quality monitoring. Each condition is marked as either accepted or appealed. The Port of Seattle appears to be the subject, with conditions relating to Des Moines Creek flow, MTCA requirements, and various environmental standards.