Re: Specific Information Needs: TESC (NHC Comment 20)

Notes

An email from Paul Fendt to Ken Ludwa responding to a request for specific information related to TESC (Temporary Erosion and Sedimentation Control) facilities. Fendt characterizes the level of detail requested as ‘absurd.’ The forwarded message from Ludwa lists the required information including clearing limits, tributary areas, pump sizes, power supply, spill prevention plans, and duration of temporary facilities.

V V