Miller Creek Restoration Project Phases Map, SeaTac/Des Moines Area

Aerial map showing Miller Creek restoration project phases along S. 200th Street corridor near the Midway Sewage Treatment Plant, with labeled construction phases (Phase 1: 2007, Phase 2: 2009, Phase 3 SeaTac and Des Moines: 2010) and erosion repair sites (Site 1: 2012, Site 2: 2011). The creek corridor is highlighted in blue/cyan running through SeaTac and Des Moines, Washington.

Notes

Aerial map showing Miller Creek restoration project phases along S. 200th Street corridor near the Midway Sewage Treatment Plant, with labeled construction phases (Phase 1: 2007, Phase 2: 2009, Phase 3 SeaTac and Des Moines: 2010) and erosion repair sites (Site 1: 2012, Site 2: 2011). The creek corridor is highlighted in blue/cyan running through SeaTac and Des Moines, Washington.