Notes
A fax cover sheet and letter from Port of Seattle to the Washington Department of Ecology, dated October 2, 2001, transmitting two documents in satisfaction of Water Quality Certification Order #1996-4-02325, Condition F.1. The letter introduces proposed construction Best Management Practices (BMPs) to prevent migration of contaminated groundwater via subsurface utility lines at Seattle-Tacoma International Airport, including requirements for dewatering, backfill permeability control, and concrete dams at utility alignments.
