Northwest Hydraulic Consultants (nhc), retained by the Airport Communities Coalition, provides follow-up technical comments on the Stormwater Management Plan (SMP) for the proposed 3rd runway development at Sea-Tac Airport. The letter identifies significant discrepancies and inconsistencies in hydrologic modeling input files, particularly regarding soil type assumptions in the Miller Creek basin. The authors conclude that the SMP’s hydrologic analysis is seriously flawed and requires a complete overhaul, including model calibration to recorded streamflow data and independent technical review.