Notes
Northwest Hydraulic Consultants (nhc), retained by the Airport Communities Coalition, submitted technical review comments on the stormwater management plan for the proposed 3rd runway at Sea-Tac Airport. The letter identifies major deficiencies in the analysis, including failure to follow King County Surface Water Design Manual and Washington State Department of Ecology requirements. Key concerns include inadequate flow control performance targets, failure to conduct required offsite analysis, and stormwater facilities that may worsen existing problems in downstream creek systems.
