
A presentation slide titled 'Surface Transportation Mitigation' describing mitigation measures for Category 1 and 2 intersections by 2032, covering 10 Category #1 intersections requiring physical improvements and 16 Category #2 intersections, with an estimated cost of approximately $40 million in transportation improvements. The slide is numbered 19, suggesting it is part of a larger presentation, but no specific organization or event name is visible.Open full document
Notes
SAMP A presentation slide titled ‘Surface Transportation Mitigation’ describing mitigation measures for Category 1 and 2 intersections by 2032, covering 10 Category #1 intersections requiring physical improvements and 16 Category #2 intersections, with an estimated cost of approximately $40 million in transportation improvements. The slide is numbered 19, suggesting it is part of a larger presentation, but no specific organization or event name is visible.