2026 05 26 rm 11b presentation SAMP ntp draft SEPA EIS page 21

2026 05 26 rm 11b presentation SAMP ntp draft SEPA EIS page 21

Slide 21 from a Sea-Tac Airport presentation outlines noise impact reduction measures, covering Construction (adherence to Port's Construction General Requirements, State of Washington, and City of SeaTac BMP requirements) and Operations (Fly Quiet Incentive Program, Late Night Noise Limitation Program, restrictive Aircraft Engine Runups, and Part 150 programs past and present).

Notes

Slide 21 from a Sea-Tac Airport presentation outlines noise impact reduction measures, covering Construction (adherence to Port’s Construction General Requirements, State of Washington, and City of SeaTac BMP requirements) and Operations (Fly Quiet Incentive Program, Late Night Noise Limitation Program, restrictive Aircraft Engine Runups, and Part 150 programs past and present).

V V