2026 05 26 rm 11b presentation SAMP ntp draft SEPA EIS page 14

2026 05 26 rm 11b presentation SAMP ntp draft SEPA EIS page 14

Presentation slide titled 'Air Quality Updates' describing methodology and findings for NEPA emissions inventories and SEPA analysis covering construction and operations phases. Findings note temporary construction-related emissions during the buildout period and small long-term increases in operational emissions, characterized as limited impacts consistent with the NEPA EA; accompanied by a map showing Discrete (Sensitive), Fenceline, and Radial Receptors along what appears to be a corridor in the Seattle/Sea-Tac area.

Notes

Presentation slide titled ‘Air Quality Updates’ describing methodology and findings for NEPA emissions inventories and SEPA analysis covering construction and operations phases. Findings note temporary construction-related emissions during the buildout period and small long-term increases in operational emissions, characterized as limited impacts consistent with the NEPA EA; accompanied by a map showing Discrete (Sensitive), Fenceline, and Radial Receptors along what appears to be a corridor in the Seattle/Sea-Tac area.

V V