Samp NTP Final NEPA EA FAA Record of Decision and SEPA Next Steps 10 22 25 Page 14

Samp NTP Final NEPA EA FAA Record of Decision and SEPA Next Steps 10 22 25 Page 14

Slide 14 from a Sea-Tac Airport presentation outlining three alternatives evaluated in the environmental review for the Seattle-Tacoma International Airport Master Plan (SAMP) Near-Term Projects (NTP): No Action, Hybrid Terminal Option, and Proposed Action. The Proposed Action includes 31 airside, cargo, landside, terminal, and airport/airline support projects designed to meet current and future needs while minimizing environmental impacts.

Notes

Slide 14 from a Sea-Tac Airport presentation outlining three alternatives evaluated in the environmental review for the Seattle-Tacoma International Airport Master Plan (SAMP) Near-Term Projects (NTP): No Action, Hybrid Terminal Option, and Proposed Action. The Proposed Action includes 31 airside, cargo, landside, terminal, and airport/airline support projects designed to meet current and future needs while minimizing environmental impacts.

V V