Samp NTP Final NEPA EA FAA Record of Decision and SEPA Next Steps 10 22 25 Page 08

Samp NTP Final NEPA EA FAA Record of Decision and SEPA Next Steps 10 22 25 Page 08

A presentation slide titled 'The Result Is Our Proposed 31 Near-Term Projects' showing a 3D aerial architectural rendering of a large airport campus with multiple terminal buildings, gates with aircraft, runways, taxiways, and surrounding urban development. The rendering depicts proposed infrastructure improvements including what appear to be new terminal structures and roadway connections highlighted in pink and green.

Notes

A presentation slide titled ‘The Result Is Our Proposed 31 Near-Term Projects’ showing a 3D aerial architectural rendering of a large airport campus with multiple terminal buildings, gates with aircraft, runways, taxiways, and surrounding urban development. The rendering depicts proposed infrastructure improvements including what appear to be new terminal structures and roadway connections highlighted in pink and green.

V V