2024_10_22_SM_Packet_Supplemental (11a SAMP EA Presentation)_15

Slide 12 from a Seattle-Tacoma International Airport Strategic Airport Master Plan (SAMP) presentation, showing an aerial map with near-term capital projects highlighted by category including Second Terminal Projects, Cargo Expansion Projects, Airfield Operational Projects, Airfield Safety/Standards Projects, and Sustainable Aviation Fuel Projects. Key elements called out with red circles and arrows include Airfield Improvements located on the airfield and terminal areas.

Notes

Slide 12 from a Seattle-Tacoma International Airport Strategic Airport Master Plan (SAMP) presentation, showing an aerial map with near-term capital projects highlighted by category including Second Terminal Projects, Cargo Expansion Projects, Airfield Operational Projects, Airfield Safety/Standards Projects, and Sustainable Aviation Fuel Projects. Key elements called out with red circles and arrows include Airfield Improvements located on the airfield and terminal areas.

V V