RP06010824

PCHBPollution Control Hearings Board of the State of Washington

Seattle-Tacoma International Airport 0(2 Y - i 2001Master Plan Update Improvements July 2001 H_AR_/_/Ua O t:'IglC,E This document contains replacement pages developed in response to comments received _om the Washington State Department of Ecology (Ecology) on Volumes 1 through 4 of the December 2000 Comprehensive Stormwater Management Plan (SMP) for the Seattle-Tacoma International Airport Master Plan Update Improvements. A facilitated process was used to document specific revisions required by Ecology to the December 2000 SMP. Each SMP volume contains an itemized list of replacement pages, and the replacement pages are identified by a July 2001 footer. ComprehensiveStormwaterManagementPlan duly2001 STIAMasterPlanUpdateImprovements 556-2912-001(28) AR 010825 SMP VOLUME 3 JULY 2001 REPLACEMENT PAGES Preface (before pg. i) List of Volume 3 Replacement Pages APPENDIX B 1: Certificate of Engineer (before pg. B l-i) Figure B 1-2 (pg. B 1-4) Section 1.1 (pg. B1-5) Figure B 1-3 (pg. B 1-6) Figure B 1-4 (pg. B 1-7) Figure B1-5 (lag. B1-8) Figure B 1-6 (pg. B 1-9) Section 1.3 (pg. BI-10) Section 1.5.2 (pg. Bl-14) Des Moines Creek HSPF Calibration Model Input Files (21 pgs.) Des Moines Creek Calibrated Model Hydrographs: SDS3 Average and Peak Daily Flow (4 pgs.) (replaces graphs previously contained on 2 pgs) Golf Weir Average and Peak Daily Flow (4 pgs.) (replaces graphs previously contained on 2 pgs) Near Mouth March 6, 1995 through March 28, 1995 (1 pg.) SDS3 December 28, 1995 through January 18, 1996 (4 pgs.) (replaces graphs previously contained on 5 pgs.) APPENDIX B2: Certificate of Engineer (pg.…
V V