EXH1158044214

PCHBPollution Control Hearings Board of the State of Washington

The attached submittal contains the first and second quarter of _ound water level measurements collected from select wells completed in the C1 (Qva) aquifer at Seattle-Tacoma International Airport. The first quarter data were previously included in the Conceptual Flow Boundary. Model Presentation package that was delivered to you on December 8, 1999. This submittal conforms with the reporting requirements of Ageed Order #97TC-N122, Section IV - Work to be Performed, Item 2. The proposed monitoring well network was approved by you in mid-September 1999 prior to the first quarterly measurement event which occurred on September 23. 1999. Six pressure trans- ducers were installed in select wells located within the Aircraft Operations and Maintenance Area (AOMA) and have been collecting water level data every six hours since September 29, 1999. The second quarterly measurement event took place on December 21, 1999. The third and fourth measurement events are scheduled for March 22, 2000 and June 21, 2000, respectively. If you have any questions regarding this data or require additional information please call me at (206) 780-9370. Sincerely, ASSOCIATED EARTH SCIENCES, INC. Bainbridge Island, Washington John Strunk Associate Geologist AR 044214 Mr. Roger Nve Department of Ecolo_ AESI Project No. BV97016D Februara- 1. 2000 Page 2 cc: Paul Agid, Port of Seattle Mike Riley, S.S. Papadopulos & Associates. Inc. Mike Staton, Maul Foster & Alongi. Inc. Eric: 1st & 2ndQuarter Ground Water Level Measurements Figure 1 - 1st Quarter Ground Water Flow Direction Map Figure 2 - 2ndQuarter Ground Water Flow Direction…
V V