EXH0682025095

PCHBPollution Control Hearings Board of the State of Washington

State of Washington Energy Facility Site Evaluation Council Project Developed By: Newport Northwest LLC AR 025095 . Jan .22 02 12:02p Rachael Paschal Osborn 509-328-81'%4 p.2 - ) The clay collarswould beplacednearthe faceof the borepits to easethe installationandto minimizeany potentialforbentonitemigrationtothecreek.Use of claycollarsisa routine conswucTJonpracticeandpresentsinsignificantriskstocreek-waterquality. •PermanentStormwaterManagement See Section 2.10.3 Permanent Stormwater Management fordetails. Runoff/Absorption Runoff from the project site is discussed in Section 2.10 Surface Water Runoff and Section 2.8.2.4 Site Stormwater System. Rainfall upon the 66-acre berrned project site will be captured androutedto oil/waterseparators,thento a detentionpondwhere the.waterwill be collectedand directedtothepowerplantCoolingtowerbasin.Duringanormalprecipitationyear,7 inchesof water will be captured over the 66-acre bermed project site. This amounts to 38.5 acre-feet per yearofwater(assumingno losstoevaporation)thatno longerwillpercolateintothesoiland gravelaquifer. ThepolicyoftheWashingtonDepartmentOfEco]ogyisfortheApplicanttorequestawaterright permitforthebeneficialuseofwaterexceeding$,000gallonsperday.The WalluJ_Power Projectwillusemore than5,000gallonsperday and thusallwatei"sources,includ:'..gthe beneficial captureand beneficial use of stormwatermust be included in the project water rights request.Inviewofthecaptureandbeneficialuseofstormwat_,theApplicantrequeststhatanew pointofwithdrawalbe establishedfortheconsolidatedBoiseCascadeCorporationfiberfarm water rights. The new point of withdrawalwill be the power plant location, to permit reuse of the stormwater. Any stormwa_er captured for the power plant use results in a corresponding reduction in groundwater withdrawals form the gravel aquifer located under the proposed power plant and the Boise Cascade Corporation fiber farm. Therefore, capture of srormwater for beneficial re-use has no net impactupon the aquiferresourcesand isnotincludedintb.ccalculationof wateruse requirements described in Section 2.5 Water Supply System. The additional point of withdrawal is acceptable froma hydrogeologic standpoint because the same body of water is involved and stormwater capture win affect existing water rights the same as the existing withdrawal locations. The on-site makeup water supply well(s) will be used…
V V