EXH0629024556

PCHBPollution Control Hearings Board of the State of Washington

2yr/2-hr: DSS Tech Note 3 Appendix C, Table C3a 2yr/72hr: DSS Tech Note 3 Appendix C, Table C3 • Design precipitations: 2yr/2hr: DSS Tech Note 3 Figure A4 - 2yr/24hr: DSS Tech Note 3 Figure A2 (from NOA.A) 2yr/72hr: 24hr x 1.23 (from Figure 8f, Characteristics of Extreme Precipitation Events in Wash State) 3yr/72hr: 2yr/24hr x 1.30 (from Figure 8f, Characteristics of Extreme Precipitation Events in Wash State) Design Flows for Effluent • For acute criterion, use the maximum of: Average flow from 2yr/2hr event, or _ [_.j C__¢Peak flow from 2yr/72hr event --_ _ L q.z,_ct • For chronic criterion, use: - Average flow from 3yr172hr event _ _e__ k.)o_.J_0_, f._co_... Basin Parameters: SDW-1 G'_"_" • Pervious area: 90.9 acres _ 6,/"_ • Impervious area: 37.0 acres • Route through detention pond (see attached storage-discharge rating curve) • Flow rates based on detention pond outflow AR 024556 FTA.BLE 47 ROWS COLS *** SDW-!: MILLER CREEK ***LEVEL 2 o,"----_'_ _"_" _J_[_"_ _ " _' 2, _3/_'_' DEPTH L_ AREA VOLUME OUTFLOW *** _ _, 55 1.00 .00 .00 00 .61- i.75- 00 1.21 2[48 ! 46 1 00 2 14 3 28 1 00 3 I0 3 92 1 00 4 07 4 47 1 00 5 05 4 96 1 00 6 06 5 40 1 00 7 09 5 82 1.00 8 03 6 27 !.00 9 08 9 05 1.00 9 63 13 97 6.4i 1.00 I0 16 15 12 1 00 I0 60 16 13 1…
V V