EXH0047017605

PCHBPollution Control Hearings Board of the State of Washington

r- , Update improvement projects are summarized in Table 1.3-1. Elements of the project that will k. result in wetland, floodplain, stream, and drainage channel impacts include the following: • Adding an 8,500-ft-long third parallel runway (16X/34X) with associated taxiway and navigational aids • Establishing standard RSAs for existing runways 16R/34L and 16L/34R • Relocating South 15#' Street north of the extended RSAs and the new third runway • Developing the South Aviation Support Area (SASA) for cargo and/or maintenance facilities • Using on-site borrow sources for the third runway embankment • Relocating, redeveloping, and expanding support facilities (passenger terminal facilities, stormwater facilities [including ouffalls], electrical substations, utifity corridors, etc.) These elements of the project are described more fully below. Table 1.3-1, Proposed Master Plan Update improvement projects at Seattle-Tacoma International Airport, Pro_ect Description Runway and Tagiway Pro_¢ts Property Acquisition, StTeet Includes purchasing propertyand demolishing existing structures between and Utility Vacation existing STIA boundary west to Des Moines Memorial Drive and State Route (SR)509. Requiredforthirdrunwayembankmentfill andcoustngt_ impact mitigation. Acquisition and demolition is also required for the south runway J_ protectionzone(RI_. " Embankmeat Ftll Embankngnt for thin/runway, com_..c_ed m/rig imported fill. Appm:_inm_ly 16.5 millic_ cubic yards(cy) will be placed over a $- m 7-year period. Existing roads and streemundezembankmmt footprint will be removed. Interconnecting Taxiways New connecting taxiways between existing runway and thirdrunway. Project is lo_tg:d on exjstlng gJFfield,rg_qtlJJrmgon]y minimal grading. Runway 16X/34X Paving of thirdrunway aftercompletion of embanknmnt fill. Extension of Runway 34R Extend runway by 600 ft for improved…
V V