EXH0008017264

PCHBPollution Control Hearings Board of the State of Washington

Sent: Friday, August 03, 2001 10:58 AM To: Kenny, Ann Subject: RE: Deliberative: Do Not Disclose, Preliminary Draft 4(_1WQC for Third Runway RCW 90.48 requiredAKART implementationin reissuances of NPDES permits. The Department will make this determinationat permitissuance. How is the 401 goingto integrate these determinations? Or_na Hess=Je-- From: Kenny, Sent: Sunday,July29,20012:43I_ To: _ Raymond;Rt2;_]ick,Ke_n;_ John;Wang,Ching-Pi;St_:kdale,Erik;Harchioro,Joan(ATG);Young,Tom(AT(;); Walter';'r_h_Wh_ng' C¢: Summertw_,._annie •Subjed:: Delia: Do Not Disclose, P_iminaw Draft 401 W_ for Third Runway ]bnp@rlance: High Deer 401 Team: Attached is a Preliminary401 WQC certification. It is stillvery rough but given the time constraintsahead of us I want to get this to youso that you can start looking it over and provide me with feedback. The stormwater related sectionswill require the most work at this point. Some of the language in this draft permit is from the o44permit,some is from the Tacoma Narrows401. We need to be sure that the 401 will be well integrated with the 402, the majormod.and future 402 permits. am waitingforadditionalconditions&ore Katie that relate to the NRMP. The Port is supposedto be submiffing revised performancestandards sometime Monday. We are stillreviewinglowflow material and more low flow materials are expected to come inthis coming Tuesday so we will not be able to work much on this section in the next couple of days. In the meantime, please send me your comments or call if you eren't sure why something is or isn'tinhere. Thanks for all yourhelp. Ann << File: DraftWQC .doc >> - AR 017264 EXH0008017264
V V