PCHB045002044

PCHBPollution Control Hearings Board of the State of Washington

On March 21, 2002, the Board ordered Ecology to redact portions of Dave Garland's testimony and submit revised direct testimony on behalf of Dave Garland. Ecology has submitted Mr Garland's revised testimony under separate cover as "Revised Direct Testimony of Dave Garland Submitted on Behalf of the Department of Ecology. Ecology submits this document to memorialize the excluded statements from Mr. Garland's testimony. The excluded statements are as follows: 4. Most recently, I reviewed PGG's updated modeling of the embankment for the December 2001 Low Stream Flow Analysis and Summer Low Flow Impact Offset Facility OFFER OF PROOF RE: EXCLUDED 1 ATTORNEYGENERALOFWASHINGTON Ecology Division STATEMENTS FROM DAVE POBox40117 GARLAND'S TESTIMONY Olympia, WA 98504-0117 AR 002044 ORIGINAL FAX(360)586-6760 Proposal submitted by the Port of Seattle. The results of my reviews have been documented in memos to Ann Kenny and others dated March 9, 2001, May 5, 2001, August 7, 2001, -- 11. The report by Pacific Groundwater Group (PGG) of November 27, 2001 titled, "Port of Seattle Sea-Tac Third Runway Embankment Fill Modeling in Support of Low- Streamflow Analysis ", which occurs as Appendix B in Low Streamflow Analysis and Summer Low Flow Impact Offset Facility Proposal (Port of Seattle, December 2001) presents significant drainage estimate improvements for the proposed runway fill embankment over drainage estimates presented in "Sea-Tac Airport Master Plan Update Low Streamflow Analysis" (Earth Tech, 2000). 12. The improvement contained in the current report is a 'fill-depth sensitive' integration of the proposed embankment fill hydrology, which sums the…
V V