EXH2003029187

PCHBPollution Control Hearings Board of the State of Washington

These draft meeting notes have been prepared by Rachel McCrea, Floyd & Snider Inc. Please reply to Rachel at rachelm@floyd-snider.com or call (206) 292-2078 with comments on the accuracy of these notes by 5pro, 6/25/01. A'i-rENDEES Ann Kenny, Dept. of Ecology Paul Fendt, Parametrix John Drabek, Dept. of Ecology Tom Atkins, Parametrix KellyWhiting, King County Alan Black, HNTB Keith Smith, Port of Seattle Rachel McCrea, Floyd & Snider Inc. Felix Kristanovich, Foster Wheeler AGENDA 1. Preliminary King County Feedback: D7A "MillerCreek" 2. Deliverable 9 =Figures" Clarification 3. Existing SMP Text that References or Summarizes Information Regarding Low Flow Impacts and Proposed Mitigation 4. Governor's Certification Requirement#5 5. Schedule Update 6. Next Meetings PRELIMINARY KING COUNTY FEEDBACK: 37A "MILLER CRESK" King County provided comments on a portion of the Miller Creek deliverable. Additional comments will be provided on 6/25 (see Next Meetings section in these notes). • The Miller Creek calibration input file will be includec_ in Deliverable 10 so that it is included in the SMP. • The Portwill revise the SDN2X-4X facility to meet 10% to,_ranc_; at the upper e_d of the performance curve. • An inconsistencybetween the SDN2X-4X 2006 flow freqt_encies and ouration cu,we will be corrected. Additionally, an inconsistent data sum:::ary sheet (potentially :Z_e wrong pa_e) ,.411be corrected. ECY00014846 C:_Tem[D_TechnlcalMl_061 _1 finai do¢wso7 o ol FINAL DR.'%FT Page 1 ot3 AR 029187 401 Permit Decision-Making, Sea-Tac Airport Third Runway Floyd & Smder I,,¢. June 18, 2001 • Drawing C133.1 shows a volume for SDW1B that is different…
V V