EXH2003029182

PCHBPollution Control Hearings Board of the State of Washington

These draft meeting notes have been prepared by Rachel McCrea, Floyd & Snider Inc. Please reply to Rachel at rachelm_floyd-snider.com or call (206) 292-2078 with comments on the accuracy of these notes by 5pm, 6/13/01. ATTENDEES Ann Kenny, Dept. of Ecology Paul Fendt, Parametrix Kelly Whiting, King County Tom Atkins, Parametrix Keith Smith, Port of Seattle Rachel McCrea, Floyd & Snider Inc. Alan Black, HNTB AGENDA 1. King County Feedback on Deliverable 4A (yellow) =Walker Creek" 2. King County Feedback on Deliverable 4B (yellow) =InfiltrationFeasibility" 3. King County Feedback on Deliverable 5 (green) =General" 4. Next Meetings 5. Schedule Update DELIVERABLE 4A (YELLOW) KING COUNTY FEEDBACK No additional revisions to Deliverable 4A "Walker Cr_ek" are required. DELIVERABLE 4B (YELLOW) KING COUNTY FEEDBACK No additional revisionsto Deliverable 4B "infiltration Feasibility" ar_ require.3. ECyO0014852 C _Teml_TechnlcaiMt.3060ro01 (_naldo¢ vvs0zr2o/ol FINAL DRAFT F.%le 1 of 3 AR 029182 401 Permit Decision-Making, Sea-Tac Airport Third Runway Floyd & $nider Inc. June 5, 2001 DELIVERABLE 5 (GREEN) KING COUNTY FEEDBACK Due to a change in the "detention provided" column heading in Table A-3, the NEPL expansion project should read =No." A green replacement page A-9 was submitted to King County and Ecology containing this ripple correction. No additional revisions to Deliverable 5 "General" are necessary. DELIVERABLE 10: MISCELLANEOUS RIPPLES Participants discussedthe need for a Deliverable 10 "Ripples" in order to coordinate revisions to the SMP that ripplefrom work completed on the other deliverables. D10 would consist of such items as: • Figure 6-1 and related table…
V V