EXH2003029174

PCHBPollution Control Hearings Board of the State of Washington

These draft meeting notes have been prepared by Kathryn Snider, Floyd & Snider Inc. Please reply to Kathryn Snider at khshome_,seanet.com or call (206) 292-2078 with comments on the accuracy of these notes by 5pm, 5125101. ATTENDEES Ann Kenny, Dept. of Ecology Tom Atkins, Parametrix John Drabek, Dept. of Ecology Alan Black, HNTB Kelly Whiting, King County Kate Snider, Floyd & Snider Inc. Keith Smith, Port of Seattle AGENDA 1. King County Feedback on Deliverable 3 (green) "Des Moines Creek" 2. King County Feedback on Deliverable 4B (pink) "Infiltration Feasibility" 3. King County Feedback on Deliverable 4A (pink) "Walker Creek" 4. King County Feedback on Deliverable 5 (yellow) "General" 5. King County Feedback on Deliverable 7B (pink) "154_ Street" 6. King County Feedback on Deliverable 8 (pink) "Volume 1" 7. Schedule update and future meeting agendas DELIVERABLE 3 (GREEN) KING COUNTY FEEDBACK No additionalrevisionsto Deliverable 3 "Des Moines Creek" are required. DELIVERABLE4B (PINK) KING COUNTYFEEDBACK The Hart Crowser report regarding infiltrationfeasibility at SDW-2 in the Walker Creek l:asin concluded that infiltrationis not feasible at the Pond F location. King County concurs with this determination. King Countyrequested two revisions that ,all be submitted as yellow Deliverable 4B. C:_DOCUME-1_lkeP.461_.OC._.S- I_Teml_tTect_t_calM ,0o,,,0,,,=_= FIHAL DRAFT ,,;b 06/11/01 P ,ge I of 5 AR 029174 ECY00018974 401 Permit Decision-Making, Sea-Tac Airport Third Runway Floyd & Snider Ir,c. May 14, 2001 1. New site map and bodng logs referenced in the last paragraph should be submitted as yellow in final submittal. 2. Add note to Sheet…
V V