EXH2003029142

PCHBPollution Control Hearings Board of the State of Washington

These draft meeting notes have been prepared by Rachel McCrea, Floyd & Snider Inc. Please reply to Rachel at (206) 292-2078, fax (206) 682-7867, rachelm__floyd-snider.com with comments on the accuracy of these notes by 5pm, Monday, 412/01. ATTENDEES John Drabek, Dept. of Ecology Paul Fendt, Parametrix Ann Kenny, Dept. of Ecology Tom Atkins, Parametdx Keith Smith, Port of Seattle Joe Brascher, AquaTerra Kelly Whiting, King County Rachel McCrea, Floyd & Snider Inc. AGENDA 1. King County feedback on Deliverable 1 "ASR Site & Appendix" (scoped 3/14, submitted 3/16) 2. Clarification regarding Deliverable 2 "Appendix B2" (scoped 3/14, submitted 3/22) 3. Preliminary discussion of progress on Deliverable 3 "Des Moines Creek" (scoped 3/16) 4. Scope Checklist Group 2: Walker Creek (Deliverable 4). 5. Schedule additional meetings of the Technical Group. DELIVERABLE 1 FEEDBACK Per the scoping discussion held 3/14, the Port verified that access to the ASR facility would occur 3 times/week. This frequency does support defining the area as "non pollution-generating surfaces." The following items will be addressed in a yellow D1 submittal, targeted for later in the week (3/28 - 3/30): 1. The Port will evaluate the proper ASR pond ouffall location. Plans will be revised to show ouffall locations. ECY00007546 C:_Temp_Tec_n,cal Mtg 032801 clraft.do¢ r__13/01 DRAFT Page 1 of 3 AR 029142 401 Permit Decision-Making, Sea-Tac Airport Third Runway Floyd &' Snider In_ March 26, 2001 2. The embankment spillway will be shown on Exhibit A-2. 3. A text change will be made regarding the use of riser…
V V