EXH2003029139

PCHBPollution Control Hearings Board of the State of Washington

These draftmeetingnotes have been preparedby RachelMcCrea, Floyd& Snider Inc. Please reply to Rachel at (206) 292-2078, fax (206) 682-7867, rachelm_.flovd-snider.comwith commentson theaccuracyof thesenotesby 5pm,Thursday,3/22101. ATTENDEES John Drabek,Dept. of Ecology PaulFendt,Parametrix Ann Kenny,Dept.of Ecology TomAtkins,Parametrix KeithSmith, Portof Seattle FelixKristanovich,FosterWheeler KellyWhiting,KingCounty RachelMcCrea,Floyd& Snider Inc. AGENDA 1. Submit Deliverable 1 (scoped 3/14) to Ecology and King County (no discussion necessary). 2. Introductionof new participants: Tom Atkins(Parametrix)is responsiblefor puttingtogethertheSMP documentandwill attendtheTechnicalGroupmeetingsto assisttheprocess. FelixKdstanovich(FosterWheeler) hasworkedon the Des Moinesand MillerCreek modeling.FelixandJoe willcheckeachothersmodelingwork. 3. ScopeChecklistGroup4: Des MoinesCreek (Deliverable3). 4. Scheduleadditionalmeetingsof the TechnicalGroup. DELIVERABLE 3 Deliverable3 is basedon Enclosure2, Group4 (Encl. 2 page29). It is targetedfor submittalto KingCountyandEcologyon 3/28. The Portand KingCountydiscussedthe scopeof each item includedin the Group4 checklist by reviewingthe relateddetailedcommentsin Enclosure2, primarilyonpages 11 - 13. The followingis a shortversionof revisionsto be done, organizedby the numberingpresented in Enclosure2 pages11 & 12: ECYO0007553 C:l,Temp_,Technctl Mtg 031601 dm_,.¢lo¢ c_13/ol DRAFT Page 1 of 3 AP, 07.9139 401 Permit Decision-Making, Sea-Tac Airport Third Runway Floyd &'Sn/der Io¢. March 14, 2001 1. Discrepancy will be fixed. 2. The Port will check this discrepancy and propose a solution for King County and Ecology review. 3. The Port will check this discrepancy and propose a solution for King County and Ecology review. NOTE: KCR comments include a number of =Recommendations" that are not linked to SMP technical compliance with the King County Surface Water Design Manual. Recommendations will be discussed in this Technical Group setting and Ecology will determine if a change is needed based on King County's recommendation. 4. Ecology and the…
V V