EXH0697026132

PCHBPollution Control Hearings Board of the State of Washington

RE: Low Streamflow Analysis and Summer Low Flow Impact Offset Facility Proposal, Water Quality Certification # 1996-4-02325 (Amended, 1) Dear Ms. Kenny: The Port of Seattle is working to finalize the Low Streamflow Analysis and Summer Low Flow Impact Offset Facility Proposal required by the referenced Water Quality Certification for the Seattle-Tacoma International Airport Master Plan Update. In order to meet the 45-day schedule set forth in Section I. 1 of the certification, the report needs to be submitted to Ecology on or before November 5, 2001. While revising the HSPF/Hydrus/Slice models to implement the changes required in section I. 1.c.i of the certification, an error was discovered in how the data is transferred between the Slice and HSPF models. Specifically, the HSPF model has a default function that assumes the input is in daily units, and automatically converts the input to hourly units. When the output from the Slice modeling was transferred to HSPF, the modeler manually applied the conversion. Therefore, the conversion was applied twice, and the effect was that the modeled embankment flow was 1/24 of what it should have been. The results of this error are that the impacts to Miller and Walker Creeks were overestimated. The actual impacts to summer low flow will be less than previously thought, and the facilities proposed to offset the impacts can be reduced in size. It is important to note that the error is limited to data handling between the models. The basic modeling approach, the calibration, and the…
V V