EXH0592023824

PCHBPollution Control Hearings Board of the State of Washington

These draft meeting notes have been prepared by Rachel McCrea, Floyd & Snider Inc. Please reply to Rachel at (206) 292-2078, fax (206) 682-7867, with comments on the accuracy of these notes by 5pro,Thursday,4/5/01. ATTENDEES John Drabek, Dept. of Ecology Paul Fendt, Pararnetdx Ann Kenny, Dept. of Ecology Tom Atkins, Parametdx Keith Smith, Port of Seattle Joe Brascher, AquaTerra KellyWhiting, KingCounty Felix Kristanovich,Foster Wheeler Alan Black, HNTB Rachel McCrea, Floyd & Snider Inc. AGENDA 1. KingCountyfeedback on PINK Deliverable 2 "Appendix B2" (scoped 3/14, submitted 3/22) 2. Scope ChecklistGroup 5: "General" (Deliverables 5 and 6). 3. Upcomingmeetings: schedule and agenda AR 023824 DELIVERABLE 2 (PINK) FEEDBACK King County provided the following feedback on the pink D2 submittal, which will be addressed in a yellow D2 submittal targeted for late this week (3/30): 1. Figure B2-3B will be changed to show gauge 42C, consistent with the scoping discussion held 3/14. 2. it,consistency in Table B2-2 will be corrected. 3. PERLND numbers that are not used in the models will not appear on the tables. This is consistent with the 12/00 SMP submittal. _. NOTE: Redline strikeout edit tracking will always be against the 12/00 submittal. There is no need to show edits of edits in this fashion. =...., DRAFT _,,_===,_==.,,_=u=._p_T.=_,,==L,_,_2=o_ _ge I of 3==r_R.._ ---" l= i 401 Permit Decision-Making, Sea-Tac Airport Third Runway Floyd & Snider l,c. March 28, 2001 4. IRS edits to Table B2-3 will be removed/undone. PERLND 16 value shouldbe 0.10. 5. PERLND 64 value(s) that are…
V V