EXH0213018767

PCHBPollution Control Hearings Board of the State of Washington

• Wetland Mitigation Ratio: 2: I out-of-basin and l: l in-basin. • Retaining Wall: Port will adhere to no more than the existing proposed footprint, no matter what. • Stormwater Manual: Port will comply with Ecology and King County Manuals. • Stormwater Detention: Port will provide Level 2 detention for entire airport. • Other... Issues Yet to be Resolved: 401-related Stormwater Issues (primarily from 401/402 matrix): Stormwater: is the 401/402 matrix adequate and acceptable? - Kevin and I agree on what's on the matrix; is anything missing? Stormwater: layout, design, footprint, impacts, and mitigation of facilities- where are the stormwater facilities going to be located, what wetland/water quality impacts are involved, and what mitigation is needed? Stormwater: construction schedule - when will the various facilities be built, and how will the construction schedule be coordinated with the various project elements coming on line? Stormwater: retrofit rec]uirements(_ same asab_v_ two items for new facilities. Stormwater: de-icin_dissol_d oxygen study - still need approvable study. Kevin sent comment letter on Port's latest submittal. Stormwater: use of Northwest Ponds as mixing zones - Port is probably not at AKART to allow this. Stormwater: role of the RDF - how do we provide adequate review of the Port's proposal to use the RDF for detention, when the RDF is still in its conceptual stage and has not been through SEPA or permitting? • includes several (?) acres of wetland impacts. • may require adjustment from guidelines in King County Manual stating no stormwater facilities to…
V V