EXH0076017719

PCHBPollution Control Hearings Board of the State of Washington

AESI PROJECT NO. BV99122C l_wo,_J ]JUNE 19, 2001 /Ex.=-No.._I /-_-:_ _/ I Corporate Office • 91 I FifthAvenue,Suite 100 • Kirtdand WA 98033 • Phone 425 827-7701 • Fax425 827-5424 West Sound Office • 179 Madrone Lane North • Ba/nbridgeIsland,WA 98110 • Phone206 780-9370 • Fax 206 780-9438 AR 017719 DRAFT TECHNICAL MEMORANDUM JUNE19, 2001 ANALYSIS OF PREFERENTIAL GROUND WATER FLOW PATHS RELATIVE TO PROPOSED THIRD RUNWAY SEATTLE-TACOMA INTERNATIONAL AIRPORT 1.0 IIVI'RODUCTION The Port of Seattle (Port) presents this technical memorandum in response to a request from the Washington Department of Ecology (Ecology). Ecology has asked the Port to respond to a concern expressed by members of the public and certain State legislators opposed to construction of the proposed Third Runway at Seattle-Tacoma International Airport (STIA). The issue presented is whether known contaminated ground water conditions located below the principal aviation operations and maintenance area (AOMA) of STIA will migrate to the third runway construction area due to the presence of subsurface utilities and/or perched zones acting as pathways of contaminant migration, and/or the natural westward flow of ground water in the upper-most regional aquifer (Qva). The purpose of this technical memorandum is to report the findings of the Port's evaluation of potential contaminant migration from the AOMA to the third runway area. The scope of this technical memorandum is to review and evaluate available data to enable a technical conclusion in response to the issues raised about proposed construction of the third runway. The issue is the potential for…
V V