EXH0010017269

PCHBPollution Control Hearings Board of the State of Washington

These draft meeting notes have been prepared by Kate Snider, Floyd & Snider Inc. Please reply to Kate at (206) 292-2078, fax (206) 682-7867, kates_.floyd-snider.com with comments on the accuracy of these notes by 5pm. Monday, 3119101. ATTENDEES John Drabek, DepL of Ecology KellyWhiting, King County Kevin Fitzpatrick,DepL of Ecology Joe Brascher,AquaTerra Ann Kenny, Dept. of Ecology Kate Snider, Floyd& Snider Inc. Keith Smith, Port of Seattle Rachel McCrea, Floyd & Snider Inc. Paul Fendt, Parametrix OVERVIEW AND RULES GOVERNING PROCESS The purpose of these Technical Meetings is to coordinatePort responses to Stom-NvaterMaster Plan (SMP) informationrequests and comments defined in enclosures to the letter from King County dated February 22, 2001. Completion of work items defined in the above referenced document is required to allow King County to determine whether the SMP is in compliance with the technical requirements of the 1998 King County Surface Water Design Manual. The ground rules for technical meetings as developed by the management group on 3/9/01 were reviewed. The focus of these technical discussionswill be on Enclosure 2 of the King County comments. The grouped checklists located in the back of Enclosure2 recap all the "big ticket" items in the Enclosure 2 comments. Additional applicable comments are includedin the body of Enclosure 2. To ensure that nothing is overlooked, the Port will review all Enclosure 2 comments and King County will identifywork items that are raised in the bodyof Enclosure2, or in other enclosures, but do not appear in the checklists. Each Technical Meeting…
V V